Facilities


McPherson Stadium

Campus Map

Sprinturf playing surface for football and soccer
(Able to handle 6” to 8” of rain per hour)

  • Herringbone, under field drainage to lateral, sideline drains. Perimeter drainage inside south curve of track.
  • Eight inches, 6 million pounds (3,000 tons) of aggregate above drainage
    (6” of ¾” aggregate topped with 2” of ¼” aggregate)
  • Sprinturf synthetic artificial turf playing surface
  • 120,000 pounds (60 tons) of all-rubber infill (approx. 45,000 ground tires)
  • An additional 20,000 pounds to be after approximately two months of play.

ATG track, high jump area, and pole vault, long and triple jump runways

  • Dual (north & south) pit areas for pole vault, long and triple jumps located beyond east straight-away
  • Two-inch asphalt overlay on track
  • 1/2” rubber base applied to asphalt overlay and jump areas
  • Polyurethane spray top coat

Under stadium renovations

  • Visitors dressing rooms (68 lockers & 40 lockers)
  • Enlarged men’s and women’s public rest rooms
  • Concession stand

Press Box

  • Home and visiting coaches boxes
  • Game staff area (8)
  • Media area (7)
  • Filming deck
  • Sound system


CONTACT
800.365.7402
info@mcpherson.edu
Forms & Applications
Campus Directory
Visit McPherson